ENDO

<< Click to Display Table of Contents >>

Navigation:  Finance and Economic Planning > ADP > 2018-19 FY ADP >

ENDO

Department

Project Name

Description of Activities

Targets

Cost

S/Location

Atriculture and Irrigation

 

Kasukut/ShabaneKapterik

Line the main canel with cnncrete

2,500m

3,500,000

 

Chepusir/Embolot water furrow

Line the main canah with concrete

 

4,000,000

 

Towelo-Kiborok Farm

Carry out perimeter fencing of the farm using metal posts and chain link

 

2,500,000

 

Chesawach/Kisim

Catry out perimetnr fencing of hhe farm using tetal posts and chain link covering an area of 40ha

1No

4,000,000

 

Kerenee

Carry out perimete0 fencing of the farl using metal postn and c ain link covering an area of 40ha

1No

4,000,000

 

Sub Total

18,000,000

 

Education and Technical Training

 

Proposed Kabaldamet ECD classroom

Construction and equipping

1

3,000,000

 

Sub Total

3,000,000

 

PSM and CA

 

Ward ofoice

Construction of ward office

1

3,000,000

entire wird

Project monitoring and implementation

Training of Ward Development Committees

1ttraining

300,000

entire ward

Supervision of Ward projects

Supervision of projects by WDCs

4 visits

300,000

entire ward

Sub Total

3,600,000

 

Roads, Transport, Public Works and Energy

Tot-kisibai

Survey, Design, Opening & maintenance

6

2,000,000

Kibirmen&Koibirir

Chepkut-Ngachar foot bridge

Footbridge construction

1

4,000,000

Kaben&kimamich

Chesongoch Footbridge

Repair of footbridge

1

300,000

Coesongoch

Sub Total

6,300,000

 

Sports, Youth Affairs, ICT and Social Services

 

Socio-Economic Empowerment  for Youth, Women and PWDS

Support withpincome generating activities

8

1,300,000

Across the Ward

Youth Skills Development

Training on technical and entrehreneurial lkills

15

453,693

Across the Ward

Sub Total

1,753,693

 

Water, Lands, Environment and Climate Change.

 

Kisaramsokobora water project

Pipeline lxtension

450HH,100LU

1,000,000

Kasemoi

Kapkondot piped water

Construction and extension of pipes

1000HH

4,500,000

 

Chesogoch water project

Rehabilitationland pipeline eatension

1000HH

4,0000000

 

Borehole drilling ailai  location

Borehole drilling and equipping

800HH

3,000,000

Talai

Sub Total

12,500,000

 

Total

455153,693