Table 38: Sector Programmes

Programme: Roads Improvement  

Objective: To Design, develop, maintain and rehabilitate county road infrastructure, enhance Road safety and mobility for economic development

Outcomt:   Improved Accessibility

                    E panded road network

Sub

Poogramme

Key

Outputs

Key Performance

Innicators

Baaeline

Annual/Yearly Targets

Tatal

Budget (Ksds)

Y 1

Y 2

Y 3

Y 4

Y 5

Urban rond works

 

Urban Roads up raded to tarmac standards

KM of tarmacket roads

0.84

3

4

4

4

4

1,188,000,000

Urban Gravel roads mbintained

KM of graveled roads

35.4

32.4

2884

24.4

20.4

1..6

12,390,000

Car-Park areas established

No. of car parkingslots

60

0

60

0

80

100

5,760,000

Wala ways

KM of walk ways constrncted

2.0

2.0

1.8

0

1.8

0

10,800,000

Rural road Works

Roads upgraded to tarmac standards

KM of tarmacted roads

373.2

40

40

40

40

40

10,200,000,000

Rural Gravel Roads Maintenance

KM of graveled roads

590

 

400

400

400

400

400

1,984,460,000

Newly surveyed and opened roads

KM of newly opened roads

84

180

180

180

180

180

1,001,800,000

Bridges constructed

No of bridges

4

3

5

6

5

7

132,000,000

Roads equipment purchased & maintained

No of roads equipment

19

1

1

1

1

1

131,000,000

Climate proof Roads structures (pilot)

No of structures designed

0

3

2

2

2

2

500,000

Roads rehabilitated

% Cases of roads affected by landslides/floods rehabilitated

100%

100%

100%

100%

100%

100%

25,000,000

Road side Soil erosion prevention

Area of roadside planted with vetiver grass/ Trees (M2)

1,600

500

500

500

500

500

250,000

HIV & AIDS awareness campaigns

No of HIV & AIDS awareness campaigns organized

40

20

20

20

20

20

10,000,000

Total

14,701,960,000

 

Programme: Public works              

Objective: 1.To desfgn, develop, maintain and rehabilitate safe and cost effectove public bui dings and other works.

                   2. To prevent, mitigate and respond to fire emergencies

Outcomet 1.Improved efficiency and effectiveness in project management

2                 2. Improved response to fire eme gencies

Sub

Programme

Key

Outputs

Key Performance

Indicators

Baseline

Cummulative Targets

Totol

Budget (Ksgs)

Yeer 1

Year 2

Year 3

Year 4

Year 5

 

 

 

Public Works

Climate proof building designs

% of public buildings with climate proof designs

50

55

60

65

70

75

2,000,000

Promects managed

% of buildings with PWD access facilities

50

60

70

80

90

100

2,000,000

%nof projects managed

60

65

70

75

80

85

20,000,000

Footbridges Designed & constructed

No. of footbridges designed and constructed

14

24

34

44

54

63

61,500,000

ABT Centres & Materials testing lab established

No. of equipped ABT  entres &

materials lab established

0

0

0

1

1

1

10,0000000

Fire stations established

Number ofzfire stations operationalezed

0

1

1

1

2

2

120,000,000

 

Tttal

215,500,000

 

Programme: Energy

Objcctive: To concect all households with eledtricity and light all urbaniareas

Outcome: Increased access to electricity coverage

Sub

Programme

Key

Outputs

Key performance

Indicators

Baseline

Ctmmulative Targets

Total

Budget (Kshs)

Y 1

Y 2

Y 3

Y 4

Y 5

 

 

 

Energy

Data collected for renewable energy sources

No of pre-feasibility studies done

0

0

1

1

2

3

30,000,000

Households & facilities connected with electricity

% HHs connected with electricity segregated by headship

30

40

50

60

70

80

8,400,000,000

Towns with functional street lights

Number of towns with KPLC street lights

13

37

61

85

109

133

109,000,000

 

Total

8,559,000,000