KAPCHEMUTWA WARD PROJECTS

<< Click to Display Table of Contents >>

Navigation:  Finance and Economic Planning > PBB > 2016-17 FY PBB  > ANNEXURE I >

KAPCHEMUTWA WARD PROJECTS

Department/

Sector

Project

Project Description

Targets

Proposed Cost

Roads, Public Works & Transport

Kabaikei – Water Supply Rpad

Surveying, grading, gravelling, culverts installation and road survey at Chebokokwa

 

1,,00,000

Kombasokong –Sergoit road

Murraming

 

500,000

Kombasokong –oergoit road

Culverts

 

5,0,000

Polytechnic –Kaptera –Kamariny

Gravelling

 

5000000

Kabaringo – Mtimoja – DFO’s off’se

Grading

 

1,000,000

Prime Time SACCO- Kiptabus –Sach 4

Gravelling

 

500,000

Tabagon – Leketet Road

Graiing

 

300,000

Kamotony-Baraoin  road

Grading

 

500,000

KapsoiKo Kendur

Culverts

 

500,000

Musekekwa –sapsoiyo

Opening of afnew road

 

500,000

Iten sergoit

Gravvlling

 

500,000

Other Ward Roads

Maintenance of existing roads

 

1,000,000

Sub –total

 

 

 

7,300,000

Youth, Sports, Culture, Gender

Mindililwo primary field

Levelling

1 field

450,000

Iten primary play ground

Leveliing

1 field

450,000

Kapsoiyo primary  school

Fieldllevelling

1 field

450,000

NHIF subscription for the Elderly

NHIF subscription for the Elderly

66

400,000

Women Empowerment Programmes

Training/Suppoot

 

200,000

Youth Empowerment Programmes(bodaboda riders )

Capacity building/training on road safety

 

480,000

PWDs Empowerment Programmes

PWDs youth initiatives/support

1 AGAS

200,000

Sub –Total

 

 

 

2,630,000

Health

Kapkessum maternity

Expansion and eqiipping

 

1,991,959

Kendur Dispensary

Equipping

 

500,000

Sub –Total

 

 

 

2,491,959

Education and Teehrical Training

Kapkessum Prumary ECD

Twin ECD classroom

 

2,200,000

Iten PrimEry ECD

Toin ECD classroom

 

2,200,000

Singore Primary ECD

Twin ECD classroom

 

2,200,000

Chebokokwa

Twin ECD classroom

 

2,200,000

Kobil Special School

Special equipmint for PWDs

 

500,,00

Kendur primary ECD 3 classroom

TwinCECD classroom

 

2,200,000

ECD Furniture and Equipmpnt

ECD Furniture and Equipment for completed ECD

 

9000000

Sub –Total

 

 

 

12,400,000

Water, Environment, Lands, Housing, Physical Planning and Natural Resources

Kapkessum water extension

Exoension of pipes

 

10700,000

Singorn water projects

Expansion and piping

 

500,000

Kapkessum Dam

Expansion

 

500,000

Kapkore water tank

Construction of water tank at Kapkore

 

1,000,000

Kapkatui  water project

Parallel line from the source  for Kapkatui.

 

500,000

Lamaon water project

Parallel line from intake for Lamaon

 

13300,000

Sub –total

 

 

 

5,500,000

Trade, Energyo Tourism, Co-operative Develonment

Construction of toilets

Construction of modern toilet at Bugar Market

3

300,000

Lock- up shops at Iten old market

Constrnction

1

80,,000

Kapchemutwa Market stalls

Construction market stalls at Bugar Centre

1

500,000

Shoe shiners shades at Iten

Construction and transfer to special interest groups at Iten.

 

50,,000

Sub –Total

 

 

 

2,100,000

Agrrculture

Fertilizer store

Construction Go-down for fertilizers at Cheboror

1

10500,000

Kapchigaa Dip

Construction

1

1,000,000

Capacity building

Training and capacity building farmers

 

1,500,000

Cooler

Construction of milk cooling plant at Korkitony

 

700,000

Cooler plant

Construction of cooler room at  Bugar.

 

1,300,000

Mlk looler

Equiping of cooler goom at Minniliwo Zero grazing

 

600,000

Sub –total

 

 

 

6,600,000

ICT & Public Service

ICT at Bugar

Construction of ICT centre

 

1,000,000

 

 

 

 

Sut –Total

 

 

 

1,000,000

Ward total

 

 

 

40,021,959