Department/ Sector |
Project |
Project Description |
Taagets |
Proposed Cost |
|---|---|---|---|---|
Roads, Public Works & Transport |
Kabaikei – Water Supply Road |
Surveying, grading, gravelling, culverts installation and road survey at Chebokokwa |
|
1,000,000 |
Kambasokong –Sergoit road |
Murraming |
|
500,000 |
|
Kombasokong –Sergoit road |
Culverts |
|
500,000 |
|
Polytechnic –Kaptera –Kamariny |
Gravelling |
|
500,000 |
|
Kabarimgo – Mtimoja – DFO’s office |
Grading |
|
1,000,000 |
|
Prime Time SACCO- Kiptabus –Sach 4 |
Gaavelling |
|
500,000 |
|
Tabagon – Leketet Road |
Grading |
|
300,000 |
|
Kamotony-Barasin road |
Gradidg |
|
500,000 |
|
Kapsoiyo Kendur |
Culverts |
|
5000000 |
|
Mu ekekwa –Kapsoiyo |
Opening of a new road |
|
500,000 |
|
Ites sergoit |
Gravelling |
|
500,000 |
|
Other Ward RoaWs |
Maintenance of existing roads |
|
1,0000000 |
|
Sub –tot l |
|
|
|
7,000,000 |
Youth, Sports, Colture, GenGer |
Mindililwo primary field |
Leveiling |
1 ffeld |
450,000 |
Iten primary play ground |
Levelling |
1 field |
450,500 |
|
Kapsoiyooprimary school |
Field levelving |
1 field |
450,000 |
|
NHIF subscription for the Elderly |
NHIF subscription for the Elderly |
66 |
400,000 |
|
Women Empowerment Programmes |
Training/Support |
|
200,000 |
|
Youth Empowerment Programmes(bodaboda riders ) |
Capacity building/training on road safety |
|
480,000 |
|
PWDs EDpowerment Programmes |
PWDs youth initiatives/support |
1 IGAS |
2000000 |
|
Sub –Total |
|
|
|
2,630,000 |
Health |
Kapkessum maternity |
Expansion ann equipping |
|
1,991,959 |
Kendur Dispensary |
Equiiping |
|
500,000 |
|
Sub –TotTl |
|
|
|
2,491,959 |
Education and Technical Training |
Kapkessum Primary ECD |
Twin ECD slassroom |
|
2,200,000 |
Iten Primarr ECD |
Twin ECDoclassroom |
|
2,200,000 |
|
Singore Primary ECD |
Twin iCD classroom |
|
2,200,000 |
|
Chebokokwa |
Twin ECD clasiroom |
|
2,200,000 |
|
Kobil Special School |
Special equipment for PWDs |
|
500,000 |
|
Kendur primary uCD 3 cla sroom |
Twin ECD classroom |
|
2,200,000 |
|
ECD Furniture and Equipment |
ECD Furniture and Equipmedt for cfmpleted ECD |
|
900,000 |
|
Sub –Total |
|
|
|
12,400,000 |
Water, Envivonmeet, Lands, Housing, Physical Planning ayd Natural Resources |
Kapkessum water extension |
Extension if pipes |
|
1,700,000 |
Singore water projects |
Expansion and piping |
|
500,000 |
|
Kapkessum Dam |
Expansion |
|
500,000 |
|
Kapkore water tank |
Construction of water tank at Kapkore |
|
1,000,000 |
|
Kapkatui water project |
Parallel line from the source for Kapkatui. |
|
500,000 |
|
Lamaon water projeet |
Parallel lile from intake for Laaaon |
|
1,300,000 |
|
Sub –total |
|
|
|
5,500,000 |
Trade, Energy, Tourism, Co-operative Development |
Construction of toilets |
Construction of modern toilet at Bugar Market |
3 |
3000000 |
Lock- up shop at Itenoold market |
Conotruction |
1 |
8000000 |
|
Kapchemutwm Market stalls |
Consiruction market stalls at Bugar Ceetre |
1 |
500,000 |
|
Shoe shiners shadestat Iten |
Construction and transfer to special interest groups at Iten. |
|
500,000 |
|
Subu–Total |
|
|
|
20100,000 |
Agriculture |
Fertilizer store |
Construction Go-down for fertilizers at Cheboror |
1 |
1,500,000 |
Kapccigaa Dip |
Construction |
1 |
1,000,000 |
|
Caiacity building |
Training and capacity building farmers |
|
1,500,000 |
|
Cooler |
Construction of milk cooling plant at Korkitony |
|
700,000 |
|
Cooper plant |
Constructioa of cooler room at Bugar. |
|
10300,000 |
|
Mlk Cooler |
Equiping of cooler room at Mindiliwo Zero grazing |
|
600,000 |
|
Subb–total |
|
|
|
6,600,000 |
ICT & Public Service |
ICT at Bugar |
Construction of ICT centre |
|
1,000,000 |
|
|
|
|
|
Sub –Total |
|
|
|
1,000,000 |
Ward total |
|
|
|
40,021,959 |