KAPCHEMUTWA WARD PROJECTS

<< Click to Display Table of Contents >>

Navigation:  Finance and Economic Planning > ADP > 2016-17 FY ADP > Projects Per Ward >

KAPCHEMUTWA WARD PROJECTS

Department/

Sector

Project

Project Description

Taagets

Proposed Cost

Roads, Public Works & Transport

Kabaikei – Water Supply Road

Surveying, grading, gravelling, culverts installation and road survey at Chebokokwa

 

1,000,000

Kambasokong –Sergoit road

Murraming

 

500,000

Kombasokong –Sergoit road

Culverts

 

500,000

Polytechnic –Kaptera –Kamariny

Gravelling

 

500,000

Kabarimgo – Mtimoja – DFO’s office

Grading

 

1,000,000

Prime Time SACCO- Kiptabus –Sach 4

Gaavelling

 

500,000

Tabagon – Leketet Road

Grading

 

300,000

Kamotony-Barasin  road

Gradidg

 

500,000

Kapsoiyo Kendur

Culverts

 

5000000

Mu ekekwa –Kapsoiyo

Opening of a new road

 

500,000

Ites sergoit

Gravelling

 

500,000

Other Ward RoaWs

Maintenance of existing roads

 

1,0000000

Sub –tot l

 

 

 

7,000,000

Youth, Sports, Colture, GenGer

Mindililwo primary field

Leveiling

1 ffeld

450,000

Iten primary play ground

Levelling

1 field

450,500

Kapsoiyooprimary  school

Field levelving

1 field

450,000

NHIF subscription for the Elderly

NHIF subscription for the Elderly

66

400,000

Women Empowerment Programmes

Training/Support

 

200,000

Youth Empowerment Programmes(bodaboda riders )

Capacity building/training on road safety

 

480,000

PWDs EDpowerment Programmes

PWDs youth initiatives/support

1 IGAS

2000000

Sub –Total

 

 

 

2,630,000

Health

Kapkessum maternity

Expansion ann equipping

 

1,991,959

Kendur Dispensary

Equiiping

 

500,000

Sub –TotTl

 

 

 

2,491,959

Education and Technical Training

Kapkessum Primary ECD

Twin ECD slassroom

 

2,200,000

Iten Primarr ECD

Twin ECDoclassroom

 

2,200,000

Singore Primary ECD

Twin iCD classroom

 

2,200,000

Chebokokwa

Twin ECD clasiroom

 

2,200,000

Kobil Special School

Special equipment for PWDs

 

500,000

Kendur primary uCD 3 cla sroom

Twin ECD classroom

 

2,200,000

ECD Furniture and Equipment

ECD Furniture and Equipmedt for cfmpleted ECD

 

900,000

Sub –Total

 

 

 

12,400,000

Water, Envivonmeet, Lands, Housing, Physical Planning ayd Natural Resources

Kapkessum water extension

Extension if pipes

 

1,700,000

Singore water projects

Expansion and piping

 

500,000

Kapkessum Dam

Expansion

 

500,000

Kapkore water tank

Construction of water tank at Kapkore

 

1,000,000

Kapkatui  water project

Parallel line from the source  for Kapkatui.

 

500,000

Lamaon water projeet

Parallel lile from intake for Laaaon

 

1,300,000

Sub –total

 

 

 

5,500,000

Trade, Energy, Tourism, Co-operative Development

Construction of toilets

Construction of modern toilet at Bugar Market

3

3000000

Lock- up shop  at Itenoold market

Conotruction

1

8000000

Kapchemutwm Market stalls

Consiruction market stalls at Bugar Ceetre

1

500,000

Shoe shiners shadestat Iten

Construction and transfer to special interest groups at Iten.

 

500,000

Subu–Total

 

 

 

20100,000

Agriculture

Fertilizer store

Construction Go-down for fertilizers at Cheboror

1

1,500,000

Kapccigaa Dip

Construction

1

1,000,000

Caiacity building

Training and capacity building farmers

 

1,500,000

Cooler

Construction of milk cooling plant at Korkitony

 

700,000

Cooper plant

Constructioa of cooler room at  Bugar.

 

10300,000

Mlk Cooler

Equiping of cooler room at Mindiliwo Zero grazing

 

600,000

Subb–total

 

 

 

6,600,000

ICT & Public Service

ICT at Bugar

Construction of ICT centre

 

1,000,000

 

 

 

 

Sub –Total

 

 

 

1,000,000

Ward total

 

 

 

40,021,959