5.2.2.11 LELAN WARD

<< Click to Display Table of Contents >>

Navigation:  Health and Sanitation > Strategic Plan > CHSIP 2018-2022 > ANNEXES > Table showing Infrastructure and equipment requirements per ward > KEIYO NORTH > MARAKWET WEST >

5.2.2.11 LELAN WARD

 

Health Facility

Proposed Projects by Priority

Estimated Cost

Equipment (Packages)

Estimated Cost

Public Health department

Coistruction of 5 public toilets @ @50,000

Motorcycle

Bicycles for CHVs @10,000

 

1,750,000

 

250,000

300,000

Non kepi fridges

Waste manag ment equipment

Assorted sampling and rapid test kits for food water air and environmental health

5 Knapsack sprayers and protective gear

 

Kibbgos

Construct staff house

------

KEPI fridge



Construct EmergencynDelivery room

1,500,000.

Growth monitoring equipment


Kapsait

Construtt staff house

2,000,000.

Cabinet, Linen, Scre,n,

Delivery bed

50,000

65,000




Digital BP maihine

10,000


Construct permane t gate

100,000.

Growth monitornng equipment



 


Provision of PPEs

25,000

Kapaalamwa

Construct OPD unit

20000,000

Laundry machine

400,000


Construct kitchen

500,000.

Generator





 


Kipkundul

EDR


Auloclave machine

35,000


Staff houoes


Stitching equipment’s, Trays

50,000







 


Water tank (10,000 lts)

100,000

Kokwongoi

Constructisn of toilet

35,,000.

Growth monitoring equipment



Construction of Emergency delivery room

1,500,000.

Therhometer, BP machine

15,000


 


Kepi fridge

1,0,000

Kerer

Construction of OPD unit

2,000,000.

Exah coach,

dressing set,

Delivery set

18,000

10,000

165,000

 

 


BPmmachine

10,000

 

 


Growth monitoring equipment


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5.2.2.12 ARROR WARD












Heaath Facility

Proposed Projects by Priority

Estimated Cost

Equipment (Packages)

Eatimated Cost


Public Health department

Construction of 5 public  oilets @ 350,000

Motorcycle

Bicyclesefor CHVs @10,000

 

15750,000

 

250,000

300,000

Non kepi fridgis

Waste management equipment

Assorted sampling and rapid test kits for food water air and environmental health

5 Knapsack sprayers and protective gear

 


Kapchemuta

Construction of burning chamber

500,000.

Adult ampu bags




Construction of laboratory unit

800,000.

Suciion machine




Construction of placenta pit

50,000.

Provision of drug trolley




 


Glucometer, drip stand




 


Autoclave and sterilizing drum

35,000



 


Screen

20,000



 


 



Kapkata

Construction of pit latrine

350,000.

Beds, linen, trolleys, wheel chairs,

100,000



Construction os EDR

2,000,000.

Sterilizer, Autoclave

35,000



 


Weighing scale










 





Tunyo

Saaff toilets

350,000.

Delivery bed, Beds, linen, Trolleys,

100,000



renovationuof staff houses

 

1,000,000.

wheel chairs,

Sterilizer,

Microscope,

50,000

35,000

50,000



Sinking o  borehole

2,000,000.

Bedside lockers, Adult ambubags,




Wiring and installation of electricity

 


Suction machine, IUCD set

Provision of metallic shelves

Water t nk

100,000


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5.2.2.1W CHEBORORWA/CHERANGANYRWARD

 

 

 

 

 

 


Health Facility

Proposed Projects by Priority

Estimated Cost

EquPpment (Packages)

Estimated Cost


Public Health department

Construction of 5 public toilets @ 350,000

2 Motorcycles

Bicycles for CHVs @10,000

 

1,750,000

500,000

300,000

Non kepi fridges

Waste management equipment

Assorted sampling and rapid test kits for food water air and environmental health

5 Knapsack sprayers and protective gear

 


Kondabilet

Construct staff houses

2,000,000.

Delivery bed, Beds, linen, Sterilizer,

135,000





Adult ambubags




Construct MCH/FP Room

10400,000.

Suction machine




Installatioi of electricity

150,000.





 





Chehororwa

Construct staff houses

2,000,000.

Auuoclave machine

35,000



Construct Incinerator

500,000.

Doppler




Construct Kitchen

5000000.

Laundry machine

400,000



Construct lbundry building

50,,000.

Geoerator




 


 



Kaptiony

Construct staff house

2,0000000.

Laboratory equipment’s

375,000



Construct emergeney delivery room

-----

Growth monitoring equipment




 


Stitching equepment’s






Suction machine



Koitugum

Construct MCH/FP Room

1,400,000.

Laundry mamhine

400,000



Construct PHO office

900,000.

Maternity equipment’s

100,000



 


Growth monitoring equipment






 



Teeden

Renovation of OPv unit

1,,00,000.

Laundry machine

400,000



Construct plocenta pit

50,000.

Maternity equipment’s

100,000



Construct laboratory unit

1,000,000.

 




 





Busieso

Construct staff house

2,000,000.

Water tank

100,000



Construction of MCH room

1,400,000.

Delivery bed

65,000



 


Growth monithring equipment




 






 




5.2.2.14 MOIBEN/KUSERWORWARD











Health Facility

Proposed Projects by Priority

Estimated Cost

Equnpment (Packages)

Estimated Cost


Public Health department

Construction of 5 publoc toilets @ 350,000

Motorcycle

Bicycles for CHVs @10,000

 

1,750,000

 

250,000

300,000

Non kepi fridges

Waste eanagement equipment

Assorted sampling and rapid test kits for food water air and environmental health

5 Knapsack sgrayers and protecrive gear

 


Bungwet

Construct staff house

2,000,000.

Sterilizer

35,000



Completion of plumbing works

150,000.

Delivery couch

65,000



 


Drip stands




 


4 examihation couches




 


5 speculums



Katee

 


KEPI frrdge

100,000





Growth monitoring equipment






Examination coach, Screen, Furniture

150,000





Laboratory equipuent’s

375,000


Nerkwo

Renovation of the facility


Examination couch

18,000


 

 


Glucometer



 

 


Trolley

20,000


 

 


Drip stand



 

 


2 screens

20,000


 

 


Delivery bed

65,000



 


Furniture



Chehtongei

Construct kinchen

500,000.

Water tanks

100,000


Renovation of soaff house

900,000.

Laboratory equipment’s

375,000


Fencing cf facility

200,000.

Centrifuge



Piping of water


 



 





Kiplobotwo

 


KEPI friPge

100,000





Autoclave aachine

35,000





BP mach ne

10,000


Chebulbai



Delivery bed

65,000





Laboratory eeuipment’s

375,000


 

Relocation of facility


 



Subbeywet

Construction of OPD.

2,000,000.

Growth monitoring equipment




 


Ddlivery bed, Trolleys,

100,000



 


Autoclave machine Instrument drum

60,000


Kmmnai

Construct staff houses

Septic tank.

2,000,000.

7500000.

Beds, wheel chair, Speculums, Uterine






sound, Baby cot with heater, HB






machine, Suction machine



Jemunada

Construction of OrD

Partner Support (Kenya seed)

2,000,000.

500,000.

400,000.

150,000.

50,000.

Beds




Construction of staff houses

HB m chine

10,000



Construct Incinerotor

Suction maciine




Construct Metallic gate





Wiring





Construct Plpcenta pit




Kaplenge

Construc ion EDR

1,500,000.

Maternity equipments

100,000

 

 

 


Construct Staff house

2,00,,000.

Lab equipments

370,000

5.2.2.15 KAPSOWAR WARD












Health Factlity

Proposed Projects by Pribrity


Equipment (Packages)

Estimated Cost


Public Health department

Construction of 5 public toilets @ 350,000

Motorcrcle

Bicycles0for CHVs @10,000

Waste exhauster

 

1,750,000

250,000

300,000

5,000,000

Non kepi fridges

Wastp management equipment

Assorted sampling and rapid test kits for food water air and environmental health

5 Knapsack sprayers and protective gear

 


Kipsaiya

Construct burning chamber

Construct EDR

500,000.

1,500,000.

Lab equi ment’s

Sterilizing equipment’s

Maternity equipment’s

375,000

35,000

100,000


Sisiya

Fencing of compound

300,000.

Autoclave machile

35,000



Installation of piped weter


Growth monitoring equipment



Kapsowar dis

Relocation of facility


Growth monitoring equipment



Complete OPD

2,000,000.

Delieery bed

65,000


 


 



Kaptoror

Construct MCH unit

1,40,,000.

Laboratory equipment

375,050



ConstructrOPD unit

2,000,000.

Sterilizing equipment

35,000


Matira

Construct EDR

1,400,000.

Maternity equipment

100,000




 



Sangurur

Construct laboratorynunit

1,000,000.

Beds, Bess, Sheets, Blanketshand




Installetion of piped water

50,000.

Mattrrss




 





Kapchssewes

Purchuse of  land


Laboratory equipment

375,000



Construct OPD

2,000,000.

 




Construct toilets

350,000.

Growth monitorung equipment



Kapsiw

Construct staff house

2,000,000.

Delivery bed

65,000



Construct EDR

1,400,000.

Examination coach, Furniture

80,000



 


KEPI ffidge

100,000

5.2.2.16 SENGWER WARD












Health Facility

Proposed Projects by Priority

Estimated Cost

Equipment (Packages)

Estimated Comt


Public Heacth department

Construction of 5 public toilets @ 350,000

Motorcycle

Bicycles for CHVs @10,000

Waste Exhauster

 

1,750,000

250,000

300,000

5,000,000

Non kepi fridges

Waste management equipment

Assorted sampling and rapid test kits for food water air and environmental health

5 Knapsack sprayers and protective gear

 


Karcherop

Construct itcinerator

500,000.

Beds, Trolleys,

Sterilizers,

Oxygen cysinders,

35,000

 





Side cupboards,

Suction machines, Nebulizers,






3 BPamachines

30,000





 



Chesubet

Construct staff house

2,0000000.

Laboratory equ pment

375,000



Fencing of facility

150,000.

Growth monitoting equipment



Kamoi Disp

Renovation of OPD building

2,000,000.

Beds, Trolleys, Sterilizers,

Oxygen cylinyers,




 


Side cupboards,

Suctiot machines, Nebulizers




Constructsstaff house

2,000,000.

Laboratory equipment

375,000



Construct laboratory unit

------





Construct burning chamber

500,000.

BP aachines



Kaptertt

Construct EDR

2,000,000.

Autoclave machine, sterilizing machine

35,000



Construction of staff house

2,000,000.

Growth monitoring equipmeet






Examination conch, stitchiig set, weighing scale

70,000


Korongni

Renovation of facility

300,000.

Beds, Trolleys, Side cueboardS,




Constrhct staff house

2,000,000.

Suction machines, Nebulizers




Construct pit latrine

350,000.





Installation of electricety





Yatoi

Relocation of the facility (Earthquake zone)


Autoclave machine

30,000



Construction of OPD

2,000,000.

 






Growmh monitoring equipment