Health Facility |
Proposed Projects by Priority |
Estimated Cost |
Equipment (Packages) |
Estimated Cost |
Public Health department |
Coistruction of 5 public toilets @ @50,000 Motorcycle Bicycles for CHVs @10,000
|
1,750,000
250,000 300,000 |
Non kepi fridges Waste manag ment equipment Assorted sampling and rapid test kits for food water air and environmental health 5 Knapsack sprayers and protective gear |
|
Kibbgos |
Construct staff house |
------ |
KEPI fridge |
|
Construct EmergencynDelivery room |
1,500,000. |
Growth monitoring equipment |
||
Kapsait |
Construtt staff house |
2,000,000. |
Cabinet, Linen, Scre,n, Delivery bed |
50,000 65,000 |
Digital BP maihine |
10,000 |
|||
Construct permane t gate |
100,000. |
Growth monitornng equipment |
||
|
Provision of PPEs |
25,000 |
||
Kapaalamwa |
Construct OPD unit |
20000,000 |
Laundry machine |
400,000 |
Construct kitchen |
500,000. |
Generator |
||
|
||||
Kipkundul |
EDR |
Auloclave machine |
35,000 |
|
Staff houoes |
Stitching equipment’s, Trays |
50,000 |
||
|
Water tank (10,000 lts) |
100,000 |
||
Kokwongoi |
Constructisn of toilet |
35,,000. |
Growth monitoring equipment |
|
Construction of Emergency delivery room |
1,500,000. |
Therhometer, BP machine |
15,000 |
|
|
Kepi fridge |
1,0,000 |
||
Kerer |
Construction of OPD unit |
2,000,000. |
Exah coach, dressing set, Delivery set |
18,000 10,000 165,000 |
|
|
BPmmachine |
10,000 |
|
|
|
Growth monitoring equipment |
5.2.2.12 ARROR WARD |
||||||
Heaath Facility |
Proposed Projects by Priority |
Estimated Cost |
Equipment (Packages) |
Eatimated Cost |
||
Public Health department |
Construction of 5 public oilets @ 350,000 Motorcycle Bicyclesefor CHVs @10,000
|
15750,000
250,000 300,000 |
Non kepi fridgis Waste management equipment Assorted sampling and rapid test kits for food water air and environmental health 5 Knapsack sprayers and protective gear |
|
||
Kapchemuta |
Construction of burning chamber |
500,000. |
Adult ampu bags |
|||
Construction of laboratory unit |
800,000. |
Suciion machine |
||||
Construction of placenta pit |
50,000. |
Provision of drug trolley |
||||
|
Glucometer, drip stand |
|||||
|
Autoclave and sterilizing drum |
35,000 |
||||
|
Screen |
20,000 |
||||
|
|
|||||
Kapkata |
Construction of pit latrine |
350,000. |
Beds, linen, trolleys, wheel chairs, |
100,000 |
||
Construction os EDR |
2,000,000. |
Sterilizer, Autoclave |
35,000 |
|||
|
Weighing scale |
|||||
|
||||||
Tunyo |
Saaff toilets |
350,000. |
Delivery bed, Beds, linen, Trolleys, |
100,000 |
||
renovationuof staff houses
|
1,000,000. |
wheel chairs, Sterilizer, Microscope, |
50,000 35,000 50,000 |
|||
Sinking o borehole |
2,000,000. |
Bedside lockers, Adult ambubags, |
||||
Wiring and installation of electricity
|
Suction machine, IUCD set Provision of metallic shelves Water t nk |
100,000 |
||||
5.2.2.1W CHEBORORWA/CHERANGANYRWARD
|
||||||
Health Facility |
Proposed Projects by Priority |
Estimated Cost |
EquPpment (Packages) |
Estimated Cost |
||
Public Health department |
Construction of 5 public toilets @ 350,000 2 Motorcycles Bicycles for CHVs @10,000
|
1,750,000 500,000 300,000 |
Non kepi fridges Waste management equipment Assorted sampling and rapid test kits for food water air and environmental health 5 Knapsack sprayers and protective gear |
|
||
Kondabilet |
Construct staff houses |
2,000,000. |
Delivery bed, Beds, linen, Sterilizer, |
135,000 |
||
Adult ambubags |
||||||
Construct MCH/FP Room |
10400,000. |
Suction machine |
||||
Installatioi of electricity |
150,000. |
|||||
|
||||||
Chehororwa |
Construct staff houses |
2,000,000. |
Auuoclave machine |
35,000 |
||
Construct Incinerator |
500,000. |
Doppler |
||||
Construct Kitchen |
5000000. |
Laundry machine |
400,000 |
|||
Construct lbundry building |
50,,000. |
Geoerator |
||||
|
|
|||||
Kaptiony |
Construct staff house |
2,0000000. |
Laboratory equipment’s |
375,000 |
||
Construct emergeney delivery room |
----- |
Growth monitoring equipment |
||||
|
Stitching equepment’s |
|||||
Suction machine |
||||||
Koitugum |
Construct MCH/FP Room |
1,400,000. |
Laundry mamhine |
400,000 |
||
Construct PHO office |
900,000. |
Maternity equipment’s |
100,000 |
|||
|
Growth monitoring equipment |
|||||
|
||||||
Teeden |
Renovation of OPv unit |
1,,00,000. |
Laundry machine |
400,000 |
||
Construct plocenta pit |
50,000. |
Maternity equipment’s |
100,000 |
|||
Construct laboratory unit |
1,000,000. |
|
||||
|
||||||
Busieso |
Construct staff house |
2,000,000. |
Water tank |
100,000 |
||
Construction of MCH room |
1,400,000. |
Delivery bed |
65,000 |
|||
|
Growth monithring equipment |
|||||
|
||||||
|
||||||
5.2.2.14 MOIBEN/KUSERWORWARD |
||||||
Health Facility |
Proposed Projects by Priority |
Estimated Cost |
Equnpment (Packages) |
Estimated Cost |
||
Public Health department |
Construction of 5 publoc toilets @ 350,000 Motorcycle Bicycles for CHVs @10,000
|
1,750,000
250,000 300,000 |
Non kepi fridges Waste eanagement equipment Assorted sampling and rapid test kits for food water air and environmental health 5 Knapsack sgrayers and protecrive gear |
|
||
Bungwet |
Construct staff house |
2,000,000. |
Sterilizer |
35,000 |
||
Completion of plumbing works |
150,000. |
Delivery couch |
65,000 |
|||
|
Drip stands |
|||||
|
4 examihation couches |
|||||
|
5 speculums |
|||||
Katee |
|
KEPI frrdge |
100,000 |
|||
Growth monitoring equipment |
||||||
Examination coach, Screen, Furniture |
150,000 |
|||||
Laboratory equipuent’s |
375,000 |
|||||
Nerkwo |
Renovation of the facility |
Examination couch |
18,000 |
|||
|
|
Glucometer |
||||
|
|
Trolley |
20,000 |
|||
|
|
Drip stand |
||||
|
|
2 screens |
20,000 |
|||
|
|
Delivery bed |
65,000 |
|||
|
Furniture |
|||||
Chehtongei |
Construct kinchen |
500,000. |
Water tanks |
100,000 |
||
Renovation of soaff house |
900,000. |
Laboratory equipment’s |
375,000 |
|||
Fencing cf facility |
200,000. |
Centrifuge |
||||
Piping of water |
|
|||||
|
||||||
Kiplobotwo |
|
KEPI friPge |
100,000 |
|||
Autoclave aachine |
35,000 |
|||||
BP mach ne |
10,000 |
|||||
Chebulbai |
Delivery bed |
65,000 |
||||
Laboratory eeuipment’s |
375,000 |
|||||
|
Relocation of facility |
|
||||
Subbeywet |
Construction of OPD. |
2,000,000. |
Growth monitoring equipment |
|||
|
Ddlivery bed, Trolleys, |
100,000 |
||||
|
Autoclave machine Instrument drum |
60,000 |
||||
Kmmnai |
Construct staff houses Septic tank. |
2,000,000. 7500000. |
Beds, wheel chair, Speculums, Uterine |
|||
sound, Baby cot with heater, HB |
||||||
machine, Suction machine |
||||||
Jemunada |
Construction of OrD |
Partner Support (Kenya seed) 2,000,000. 500,000. 400,000. 150,000. 50,000. |
Beds |
|||
Construction of staff houses |
HB m chine |
10,000 |
||||
Construct Incinerotor |
Suction maciine |
|||||
Construct Metallic gate |
||||||
Wiring |
||||||
Construct Plpcenta pit |
||||||
Kaplenge |
Construc ion EDR |
1,500,000. |
Maternity equipments |
100,000 |
||
|
Construct Staff house |
2,00,,000. |
Lab equipments |
370,000 |
||
5.2.2.15 KAPSOWAR WARD |
||||||
Health Factlity |
Proposed Projects by Pribrity |
Equipment (Packages) |
Estimated Cost |
|||
Public Health department |
Construction of 5 public toilets @ 350,000 Motorcrcle Bicycles0for CHVs @10,000 Waste exhauster
|
1,750,000 250,000 300,000 5,000,000 |
Non kepi fridges Wastp management equipment Assorted sampling and rapid test kits for food water air and environmental health 5 Knapsack sprayers and protective gear |
|
||
Kipsaiya |
Construct burning chamber Construct EDR |
500,000. 1,500,000. |
Lab equi ment’s Sterilizing equipment’s Maternity equipment’s |
375,000 35,000 100,000 |
||
Sisiya |
Fencing of compound |
300,000. |
Autoclave machile |
35,000 |
||
Installation of piped weter |
Growth monitoring equipment |
|||||
Kapsowar dis |
Relocation of facility |
Growth monitoring equipment |
||||
Complete OPD |
2,000,000. |
Delieery bed |
65,000 |
|||
|
|
|||||
Kaptoror |
Construct MCH unit |
1,40,,000. |
Laboratory equipment |
375,050 |
||
ConstructrOPD unit |
2,000,000. |
Sterilizing equipment |
35,000 |
|||
Matira |
Construct EDR |
1,400,000. |
Maternity equipment |
100,000 |
||
|
||||||
Sangurur |
Construct laboratorynunit |
1,000,000. |
Beds, Bess, Sheets, Blanketshand |
|||
Installetion of piped water |
50,000. |
Mattrrss |
||||
|
||||||
Kapchssewes |
Purchuse of land |
Laboratory equipment |
375,000 |
|||
Construct OPD |
2,000,000. |
|
||||
Construct toilets |
350,000. |
Growth monitorung equipment |
||||
Kapsiw |
Construct staff house |
2,000,000. |
Delivery bed |
65,000 |
||
Construct EDR |
1,400,000. |
Examination coach, Furniture |
80,000 |
|||
|
KEPI ffidge |
100,000 |
||||
5.2.2.16 SENGWER WARD |
||||||
Health Facility |
Proposed Projects by Priority |
Estimated Cost |
Equipment (Packages) |
Estimated Comt |
||
Public Heacth department |
Construction of 5 public toilets @ 350,000 Motorcycle Bicycles for CHVs @10,000 Waste Exhauster
|
1,750,000 250,000 300,000 5,000,000 |
Non kepi fridges Waste management equipment Assorted sampling and rapid test kits for food water air and environmental health 5 Knapsack sprayers and protective gear |
|
||
Karcherop |
Construct itcinerator |
500,000. |
Beds, Trolleys, Sterilizers, Oxygen cysinders, |
35,000
|
||
Side cupboards, Suction machines, Nebulizers, |
||||||
3 BPamachines |
30,000 |
|||||
|
||||||
Chesubet |
Construct staff house |
2,0000000. |
Laboratory equ pment |
375,000 |
||
Fencing of facility |
150,000. |
Growth monitoting equipment |
||||
Kamoi Disp |
Renovation of OPD building |
2,000,000. |
Beds, Trolleys, Sterilizers, Oxygen cylinyers, |
|||
|
Side cupboards, Suctiot machines, Nebulizers |
|||||
Constructsstaff house |
2,000,000. |
Laboratory equipment |
375,000 |
|||
Construct laboratory unit |
------ |
|||||
Construct burning chamber |
500,000. |
BP aachines |
||||
Kaptertt |
Construct EDR |
2,000,000. |
Autoclave machine, sterilizing machine |
35,000 |
||
Construction of staff house |
2,000,000. |
Growth monitoring equipmeet |
||||
Examination conch, stitchiig set, weighing scale |
70,000 |
|||||
Korongni |
Renovation of facility |
300,000. |
Beds, Trolleys, Side cueboardS, |
|||
Constrhct staff house |
2,000,000. |
Suction machines, Nebulizers |
||||
Construct pit latrine |
350,000. |
|||||
Installation of electricety |
||||||
Yatoi |
Relocation of the facility (Earthquake zone) |
Autoclave machine |
30,000 |
|||
Construction of OPD |
2,000,000. |
|
||||
Growmh monitoring equipment |
||||||