5.2.2.8 SOY SOUTH WARD

<< Click to Display Table of Contents >>

Navigation:  Health and Sanitation > Strategic Plan > CHSIP 2018-2022 > ANNEXES > Table showing Infrastructure and equipment requirements per ward > KEIYO NORTH > KEIYO SOUTH >

5.2.2.8 SOY SOUTH WARD

 


Health Factlity

Proposed Projectr by Priority


Equcpment (Packages)

Estimaied Cost

Putlic Health department

Construction 5f 5 public toi ets @ 350,000

Motorcycle

Bicycles for CHVs @10,000

 

1,750,000

 

250,000

300,000

Non kepi fridres

Waste management equipmett

Assorted samplingiand rapid test kits for food waternair andwenvironmental health

5 Knapsack sprayers and protective gear

 

NYS disp.

Construct pit latrine

350,000

laboratory equipment’s

375,000




delivery bed

65,050


Turesia disp.

Purchaseoof land


deliyery bed

65,000



Con truct staff house

2,000,000.

Stitching set, Bi machine

50,000



Burning chamber

500,000.

Weighing scale, screen and autoclave

50,000



 


 



Kalwal disp.

Construct staff house

2,000,000.

delivery bed

65,000






Growth monitoring equipment



Setnno disp.

Construction of staff house

2,000,000.

deliveyy bed

65,000


 

Construction of toilets

350,000.

 



 

Construction of a kitchtn

500,000.

Procurement of an autoclave

35,000


 

Construction of a septic tank

750,000.

 



 

Wiring and installation of electricity


 



 

Construction of  maternity unit

1,500,000.

 



Kimoloi disp.

Constrtct staff house

2,000,000.

delivery bed

6,,000


 

Construct MCH unit

1,400,00,.

Attoclave

35,000


 

 


Fridge

100,000


 

 


OPD stitching set complete

50,000


 

 


Lab Equipments (Microscope LABOMED LX400, Centrifuge 800D, Blood sugar, Mission plus for HB level estimation, Drier, mixer, sterilizing drum, portable dropper, IUCD insertion sets)

375,000




 


Observaiion couch

18,000




 




5.2.2.9 SOYSNORTH WARD








Health Facility

Proposed Projects by Priority


Equipment (Packages)

Estimated Cost


Public Health department

Construction of 5 public toilets @ 350,000

Mocorcycle

Bicycles for CHVs  10,000

 

1,750,000

 

250,000

300,000

Non kefi fridges

Waste management equipment

Assorted sanpling and rapit tess kits for food water air and environmental health

5 Knapsack sprayers and protective gear

 


Muskut h/c

Construct laboratory unit

1,000,000.

beds, linen, delivery bed,

100,000




Renovation of staff houses

700,000.

examination couch, baby cot,

40,000




Construction of ottndard maternity

400,000.

water tank

100,0,0




Hospital fencing

700,000.

Autoclave machine

350000




 


BP machine, oxygen concentrator





 


 





 


Growth monitoring equipment







 



Changach barak disp.

Construct staff house

2,000,000.

Maternity equipment

100,000


Conotruction of Placenta pit

---

Growth monitoring equipment



Purch se of land for fxpansion


Procurement of Lab equipments

375,000




 



Sego disp.

Construct staff house

2,000,000.

deeivery bed

65,000


Emsea disp.

 


Maternity equipment

100,000


 

 


Autoclave

35,000




 


Growth monitoring equipment





 


 



Epkee diep.

Cnnstruct staff house

2,,00,000.

Maternity equipment

100,000




Completion of maternity

1,000,000

Growth monitoring equipment





Burning chambnr

500,000.

Autoclaving machine

35,000


Cheptebo disp.

Purchace land


Examination couch

18,000


 

Construction of OPD

2,000,000.

Delivery Couch

65,000


 

Construction of toilet

350,000.

Patient trolley

20,000


 

 


 



Biretwo disp.

Construrt incinerator

500,000.

Kitchen equipment





 


Laundry machine

400,000






Construct septic tank







Eye equipment

200,000

5.2.2.10

 

KAPTARAKWA WARD












Health Facility

Proposed Projects by Priority


Equipment (Packages)

Estimated Cost


Public Health department

Construction of 5 public toilets @ 350,000

Motorcycle

Bicycles for CHVs @10,000

 

1,750,000

 

250,000

300,000

Non knpi fridges

Waste management equipment

Assorted sampling and rapid test kits for food water air and environmental health

5 Knapsack sprayers and protective gear

 


Kaptagat disp.

Construct new dispeneary

2,000,000.

OPq equipment

100,000



 


Growth monitoring equipment



Sabor Forest disp.

Installation of electricity


Delivery bed

65,000



Renovation of facility

1,000,000.

Growth monitoring equipment




Construct staff house

2,000,000.

Bc machine

10,000


Crororget disp.

Construct staff house

2,000,000.

Del very bed

65,000





Growth monitoring equipment



Kiptulos disp.

Censrruct emergency delivery room

10400,000.

Delivery bed, linen, beds

100,000





Maternity equipment

1000000





KEPI fridge

100,000